Sino-Sources

Used scaffolding for sale wholesale

Payment Terms: TT or LC

Ref Price : 6-15USD/PAIR

Supply Capability : 1000T

Loading Port : TianJin

Inquire Now

Sino-Sources Service Pledge

  • Quality Product Quality Product
  • Purchasing Credit Purchasing
  • Credit Rating Credit Rating
  • Timely Delivery Timely Delivery
  • Order On-line Tracking Order On-line Tracking
  • Credit Services Credit Services

Quick Details



Quick Details:



Place of Origin:

Tianjin, China (Mainland)

Brand Name:

SINO EAST

Model Number:

Ringlock system

Type:

2016 hotsale scaffolds

Material:

Q235,Q345

Surface treatment:

Electro, HDG

Place of Origin::

TianJin, China

Componet:

Base collar, Base jack, U head jack, Stair case, Rosettle, etc

Use:

For construction engineering

Marketing:

worldwide Layher Modular Scaffolding System

System:

Tower type stair access, scaffold stairway platform, etc

Standard:

0.5m, 1.0m, 1.5m, 2.0m, 2.5m-4.0m

Pipe:

48.3x2.5mm, 2.75mm, 3.2mm







Description:


 

Name Scaffolding Frame
Place of Origin Tianjin China
Brand name SINO EAST
Size Ø48.3*3.25*1000/2000/3000 or as your request
Main Material Q195,Q235,Q345
Sufrace Treatment High Protected Painted, Powder Coating, Electric Gavenized, Hot Dip Gavenized
Application Indoor building construction
Color Silver, Orange or as request 
Certificate EN12810,SGS test report for loading capacity
Service OEM Service avaliable
MOQ 1X20GP
Payment T/T,L/C,Cash
Delivery Time About 15-30 days after confirmation
Packing In bulk or steel pallet or as your request
Production Capability 100 tons per day
Manufactory Location  Tianjin ,China





Products:



High quality product of Used scaffolding for sale wholesale



Equipment:



Advanced equipment of Used scaffolding for sale wholesale



Packaging & Shipping



Packaging and shipping equipment of Used scaffolding for sale wholesale



Certificate:


certificate of sino



Advantages:



1、We have our own factory to produce our products.


2、We have a number of excellent line service team.


3、We offer a full range of quality assurance services.



FAQ:




Q: May I have some samples before bulk order?

A: Yes, you can. We can arrange the shipment according to your requirements.



Q: Do you have quality control?

A: Sure. We have the most advanced testing equipment for very strict quality control. 


Q:How about the delivery?

A: By containers on ship or railway wagon ,and bulk ship . Safe and cost effective way of delivery . 


Q:What about the lead time for mass production?

A:Honestly, it depends on the order quantity and the season you place the order.




Contact US:



Skype: paulpaul120481


Mobile: +86 18622088833 (whatsapp,line)


Email: info@sino-sources.com




   

The nation's steel consumption is expected to rise 7.7 percent to 725 million metric tons this year amid an improving economy and better performance of major steel consumers, an industry research and planning institute said on Monday.The country's steel demand will grow by 0.7 percent to 730 million tons in 2018, said a report from the China Metallurgical Industry Planning and Research Institute.

China's crude steel output will increase 3 percent year-on-year to 832 million tons in 2017, and by a further 0.7 percent to 838 million tons next year.Iron ore demand in the world's top buyer is expected to rise 1.3 percent to 1.122 billion tons in 2017 from last year and drop 0.2 percent to 1.12 billion tons in 2018.Major steel consumers including real estate construction, machinery, automobile, energy and shipbuilding will be the main contributors to the country's rising steel demand next year.

Real estate construction will remain the biggest consumer of steel products in 2018, with demand amounting to 388 million tons, up by 0.3 percent from this year which is estimated at 387 million tons.The machinery industry comes second with 138 million tons of expected steel demand in 2018, up by 1.5 percent year-on-year, followed by the automobile industry with 59.5 million tons, and energy with 32.5 million tons.

Li Xinchuang, president of the institute, said that China will continue to cut outdated steel capacity and manufacture more green and high-quality steel products next year."China's steel manufacturing infrastructure is the most advanced in the world. The small and unregulated steel mills, which are producing substandard steel with high pollution, should be eliminated," Li said."The steel enterprises should increase their investment in research and development as well as environmental protection to maintain their competitiveness in the world," Li added.

Earlier this year, the National Development and Reform Commission, the country's top economic planner, set a timeline to 

phase out production of low-quality steel made from scrap metal, or ditiaogang, before the end of June.Authorities have sent 12 inspection groups to some areas including Hebei, Henan and Heilongjiang provinces, and the Guangxi Zhuang autonomous region to oversee the move, according to Lin Nianxiu, deputy head of the NDRC.China plans to reduce crude steel output by 100 to 150 million tons by 2020.

More than 65 million tons of steel production capacity was phased out in 2016, beating the annual target. The country met the 2017 capacity reduction goal of 50 million tons by the end of August this year.In 2016, the central government spent over 30 billion yuan ($4.53 billion) helping 726,000 workers made redundant in the steel and coal industries to find new jobs. The number of workers to receive aid this year is estimated at 500,000.

---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------




Send a message to us:

upload

Remaining: 4000 characters